Video clips of Hoverbarges in operation
HOVER90TM
Video of the 90 tonne payload modular Hoverbarge which is available for charter.
The Yukon Princesses
Designed by Mackace Ltd, two 160 tonne payload modular Hoverbarges were used in Alaska in 1976, due to the delay in building a permanent bridge across the Yukon river. The Managing Director of Mackace Ltd during the Yukon project is currently the Chief Technology Officer of Hovertrans Solutions Pte. Ltd.
35 Years of the Hoverbarge
The following video contains a selection of clips of previous Hoverbarge operations from around the World. All of which the management team of Hovertrans Solutions were involved in.
The following video contains a selection of clips of previous Hoverbarge operations from around the World. All of which the management team of Hovertrans Solutions were involved in.
About Us | News | Facilities | Hoverbarge History | Hovercraft Consultancy Services | Hovercraft Feasibility Studies | Hoverbarge Range | Hoverbarge Video | Hovercraft / Hoverbarges | F.A.Qs | Contact us | View site map
Arctic Supply Craft
|
Shallow water Drilling |
Shallow Water Ferries |
Heavy Equipment Transport |
Ice Road Alternative |
Oil Spill Response |
Shallow Water Pipe Laying | Ship to Shore Connector
| Shallow Water Wind
Farm Access | Amphibious Vehicles
| Large Hovercraft |
Commercial
Hovercraft | Shallow Water Boats
| Dredging Alternative |
Temporary Road
Alternative